Please use this identifier to cite or link to this item:
http://hdl.handle.net/10603/485645
Title: | Reservoir operation considering downstream impact of a hydroelectric project |
Researcher: | Ray, Maya Rajnarayan |
Guide(s): | Sarma, Arup Kumar |
Keywords: | Engineering Engineering and Technology Engineering Civil |
University: | Indian Institute of Technology Guwahati |
Completed Date: | 2010 |
Abstract: | With the increasing demand of power hydropower projects are coming up at a much faster rate the developing countries of the world theses projects are generally operated to meet the power demand during peak hours which induces significant diurnal variations downstream of the dam |
Pagination: | Not Available |
URI: | http://hdl.handle.net/10603/485645 |
Appears in Departments: | DEPARTMENT OF CIVIL ENGINEERING |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
01_fulltext.pdf | Attached File | 9.52 MB | Adobe PDF | View/Open |
04_abstract.pdf | 203.08 kB | Adobe PDF | View/Open | |
80_recommendation.pdf | 396 kB | Adobe PDF | View/Open |
Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).
Altmetric Badge: