Please use this identifier to cite or link to this item: http://hdl.handle.net/10603/485645
Title: Reservoir operation considering downstream impact of a hydroelectric project
Researcher: Ray, Maya Rajnarayan
Guide(s): Sarma, Arup Kumar
Keywords: Engineering
Engineering and Technology
Engineering Civil
University: Indian Institute of Technology Guwahati
Completed Date: 2010
Abstract: With the increasing demand of power hydropower projects are coming up at a much faster rate the developing countries of the world theses projects are generally operated to meet the power demand during peak hours which induces significant diurnal variations downstream of the dam
Pagination: Not Available
URI: http://hdl.handle.net/10603/485645
Appears in Departments:DEPARTMENT OF CIVIL ENGINEERING

Files in This Item:
File Description SizeFormat 
01_fulltext.pdfAttached File9.52 MBAdobe PDFView/Open
04_abstract.pdf203.08 kBAdobe PDFView/Open
80_recommendation.pdf396 kBAdobe PDFView/Open
Show full item record


Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).

Altmetric Badge: