Please use this identifier to cite or link to this item: http://hdl.handle.net/10603/460704
Full metadata record
DC FieldValueLanguage
dc.coverage.spatial
dc.date.accessioned2023-02-18T05:11:17Z-
dc.date.available2023-02-18T05:11:17Z-
dc.identifier.urihttp://hdl.handle.net/10603/460704-
dc.description.abstractThe study was conducted in Dindur sub watershed of Gadag and Bedwatti sub newlinewatershed of Koppal district during the year 2020-21. Three micro watersheds from each sub newlinewatershed were selected. From each micro watershed, thirty farmers were selected making the newlinetotal sample of 180 farmers. The primary data was collected through personal interview newlinemethod using pre tested interview schedule. newlineThe study observed that, on an average 389.36 Rmt of trench cum bund was newlineestablished in each farmer s field. Similarly, 0.57, 1.34 and 0.19 number of farm ponds, waste newlineweirs and bore well recharge were adopted by each farmer, respectively. Approximately 13.92 newlinenumbers of cashew plants and 9.79 teak were planted by each farmer. The project had resulted newlinein an increased productivity of major crops like maize (38.08 %) followed by greengram newline(28.51 %) and groundnut (25.39 %). The productivity of rabi sorghum was increased by 40.34 newlineper cent. The project had significant impact on socio-economic status especially on the newlinedimensions like education status, social participation, type of house, asset possession, farm newlinepower possession, daily wage employment, employment generation, source of irrigation, newlineborrowing status, access to basic needs and consumption pattern. newlineThe study also revealed that, there was a positive and significant relationship of newlineindependent variables like land holding, resource base, cropping intensity, scientific newlineorientation, risk orientation with the adoption of Sujala III watershed interventions at one per newlinecent level of significance. While, education, annual income and extension participation were newlinesignificantly correlated with adoption at five per cent. Further, low maintenance by committee newline(317), lack of guidance during post project period (293), lack of transparency (288) and newlinefarmers consent was not taken (254) were the major problems expressed by farmers in newlineadoption of watershed interventions. The study recommends social engineering before newlineimplementation of the project.
dc.format.extent260
dc.languageEnglish
dc.relation
dc.rightsuniversity
dc.titleImpact of Sujala Iii Watershed Development Interventions in Northern Dry Zone of Karnataka
dc.title.alternative
dc.creator.researcherBindu, N.
dc.subject.keywordAgricultural Sciences
dc.subject.keywordAgriculture Multidisciplinary
dc.subject.keywordLife Sciences
dc.subject.keywordWatershed Development Interventions in Northern Dry Zone
dc.description.note
dc.contributor.guideDolli, S.S.
dc.publisher.placeDharwad
dc.publisher.universityUniversity of Agricultural Sciences, Dharwad
dc.publisher.institutionDepartment of Agricultural Extesion Education
dc.date.registered
dc.date.completed2022
dc.date.awarded2022
dc.format.dimensions32 Cms
dc.format.accompanyingmaterialDVD
dc.source.universityUniversity
dc.type.degreePh.D.
Appears in Departments:Department of Agricultural Extesion Education

Files in This Item:
File Description SizeFormat 
01_title.pdfAttached File28.65 kBAdobe PDFView/Open
02_prelim pages.pdf21.65 kBAdobe PDFView/Open
03_table of content.pdf55.16 kBAdobe PDFView/Open
04_abstract.pdf17.26 kBAdobe PDFView/Open
05_chapter 1.pdf77.1 kBAdobe PDFView/Open
06_chapter 2.pdf193.38 kBAdobe PDFView/Open
07_chapter 3.pdf1.6 MBAdobe PDFView/Open
08_chapter 4.pdf1.23 MBAdobe PDFView/Open
09_chapter 5.pdf226.45 kBAdobe PDFView/Open
10_annexure.pdf430.65 kBAdobe PDFView/Open
80_recommendation.pdf464.84 kBAdobe PDFView/Open


Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).

Altmetric Badge: