Please use this identifier to cite or link to this item: http://hdl.handle.net/10603/361949
Full metadata record
DC FieldValueLanguage
dc.coverage.spatialMathematics
dc.date.accessioned2022-02-14T06:47:16Z-
dc.date.available2022-02-14T06:47:16Z-
dc.identifier.urihttp://hdl.handle.net/10603/361949-
dc.description.abstractIn the thesis, the mathematical models of multi-machine permutation flow shop scheduling problems are presented. Flow shop is one of the widely studied system configuration of production environment which ensures the natural ordering of machines through which the jobs are processed in a fixed order. This system configuration has been studied under the deterministic and stochastic variations of scheduling parameters. Further, the impact of various forms of production environments, including no-wait, no-idle time on scheduling of jobs over the available system of machines have been reported. The importance of different scheduling parameters, specifically sequence-dependent setup time, sequence-independent setup time, uncertain processing time, and uncertain maintenance activities, in real world production enterprises has been illustrated. Single-objective and multi-objective flow shop scheduling problems of optimizing the different performance measures of production environments, particularly makespan, system utilization time, and system idle time have been introduced. Various computational techniques specifically the heuristics and metaheuristics have been successfully developed and implemented to solve these NP-complete combinatorial optimization problems. Extensive computational experiment has been carried out to analyse the superiority of the proposed computational techniques in term of effectiveness and efficiency in solving the presented mathematical models. newline
dc.format.extent295p.
dc.languageEnglish
dc.relation-
dc.rightsuniversity
dc.titleMathematical modeling and optimization approach to study flow shop scheduling models
dc.title.alternative
dc.creator.researcherSharma, Meenakshi
dc.subject.keywordDelay time
dc.subject.keywordFlow shop scheduling
dc.subject.keywordHeuristic
dc.subject.keywordMetaheuristic
dc.subject.keywordScheduling
dc.description.noteBibliography 283-295p.
dc.contributor.guideSharma, Manisha
dc.publisher.placeChandigarh
dc.publisher.universityPanjab University
dc.publisher.institutionDepartment of Mathematics
dc.date.registered2017
dc.date.completed2021
dc.date.awarded2021
dc.format.dimensions-
dc.format.accompanyingmaterialCD
dc.source.universityUniversity
dc.type.degreePh.D.
Appears in Departments:Department of Mathematics

Files in This Item:
File Description SizeFormat 
01_title page.pdfAttached File76.38 kBAdobe PDFView/Open
02_correction_certificate.pdf201.14 kBAdobe PDFView/Open
03_contents.pdf73.23 kBAdobe PDFView/Open
04_acknowledgements.pdf60.8 kBAdobe PDFView/Open
05_chapter-1.pdf387.15 kBAdobe PDFView/Open
06_chapter-2.pdf432.97 kBAdobe PDFView/Open
07_chapter-3.pdf610.09 kBAdobe PDFView/Open
08_chapter-4.pdf1.36 MBAdobe PDFView/Open
09_chapter-5.pdf616.87 kBAdobe PDFView/Open
10_chapter-6.pdf503.49 kBAdobe PDFView/Open
11_chapter-7.pdf868.12 kBAdobe PDFView/Open
12_list of research papers.pdf126.73 kBAdobe PDFView/Open
13_bibliography.pdf193.69 kBAdobe PDFView/Open
80_recommendation.pdf343.43 kBAdobe PDFView/Open


Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).

Altmetric Badge: