Title: Implementation of evolutionary algorithms for solving economic load dispatch with practical constraints
Researcher: Karthikeyan M
Guide(s): Sree renga raja T
Keywords: Engineering and Technology
Engineering
Engineering Electrical and Electronic
constraints
dispatch
University: Anna University
Completed Date: 2019
Abstract: An interconnected electric power system is a complex network comprising of three functional systems namely the generation, transmission and distribution systems. These systems are connected by various components such as the transmission lines, transformers and circuit breakers. The primary goal of power system is to ensure the availability of electrical energy without interruption to every consumer connected to the system. To meet out the rapid increase in load and demand in electricity market, new generating units or transmission lines should be added to the system to avoid the overloading of existing system. Laying of new lines or installation of new generating stations imposes environment and economic constraints. Hence overloading of existing lines arises which results in increased investment for secure operation of the power system. Therefore it is evident that economy and security are competitive elements and the decision of the system operator is highly important during the planning and operation of the power system. The scheduling of the available generated power is an important part in planning and operation of the power system. Power system planning and operation specifies the safe operating level of the system under the specified condition with expected contingencies. The increased utilization of the existing power systems and contingency such as outage of line, generator or loss of a transformer pushes it into a highly stressed condition. Traditionally the electric power systems are operated in such a way that the total cost of fuel is minimized regardless of emission produced. With increased requirements for environmental production, an alternative strategies are required. newline
Pagination: xvii, 130p.
URI: http://hdl.handle.net/10603/303026
Appears in Departments:Faculty of Electrical Engineering

Files in This Item:
File Description SizeFormat 
01_title.pdfAttached File275.78 kBAdobe PDFView/Open
02_certificates.pdf1.29 MBAdobe PDFView/Open
03_abstracts.pdf281.83 kBAdobe PDFView/Open
04_acknowledgements.pdf276.44 kBAdobe PDFView/Open
05_contents.pdf294.25 kBAdobe PDFView/Open
06_listofabbreviations.pdf278.19 kBAdobe PDFView/Open
07_chapter1.pdf332.57 kBAdobe PDFView/Open
08_chapter2.pdf330.81 kBAdobe PDFView/Open
09_chapter3.pdf333.89 kBAdobe PDFView/Open
10_chapter4.pdf324.39 kBAdobe PDFView/Open
11_chapter5.pdf317.94 kBAdobe PDFView/Open
12_chapter6.pdf315.55 kBAdobe PDFView/Open
13_chapter7.pdf445.34 kBAdobe PDFView/Open
14_chapter8.pdf307.49 kBAdobe PDFView/Open
15_conclusion.pdf281.88 kBAdobe PDFView/Open
16_references.pdf308.51 kBAdobe PDFView/Open
17_listofpublications.pdf277.24 kBAdobe PDFView/Open
80_recommendation.pdf39.39 kBAdobe PDFView/Open
Show full item record


Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).

Altmetric Badge: