Please use this identifier to cite or link to this item: http://hdl.handle.net/10603/302835
Title: Scheduling optimization of identical parallel machine problems using metaheuristics
Researcher: Somasundaram K
Guide(s): Saravanan M
Keywords: Metaheuristics
Makespan
Just-in-time principle
University: Anna University
Completed Date: 2019
Abstract: Purpose of production scheduling is to find the job sequence in such a way that one or more objectives are optimized Most of the research articles are addressing the identical parallel machine scheduling problem with respect to techniques and performance measures The most widely considered performance measures are makespan maximum completion time of all jobs total tardiness and number of tardy jobs Makespan is related to improving system utilization while the remaining measures are related to job due date of systems Makespan in scenario criteria plays a vital role in order to amplify the productivity and maximum utilization of resources modern manufacturing operations and on time delivery is a significant factor towards realizing satisfaction of customers and management The problem with due date related objectives have also received considerable attention in recent years due to the introduction of new methods of inventory management based on principles such as just in time JIT principle In the JIT system jobs are to be completed in the last minute which leads to scheduling problems which in turn affects the production cost In todays competitive and dynamic environment cost of production must be reduced in order to survive which can be done by effective utilization of all the resources and completion of production in shorter duration to increase the productivity and simultaneously considering the due dates of the job A minimization of makespan with not meeting the due date is no use for firms and would incur loss of market competitiveness and loss of customers newline
Pagination: xxv,197.
URI: http://hdl.handle.net/10603/302835
Appears in Departments:Faculty of Mechanical Engineering

Files in This Item:
File Description SizeFormat 
01_title.pdf.pdfAttached File46.05 kBAdobe PDFView/Open
02_certificates.pdf.pdf2.03 MBAdobe PDFView/Open
03_abstracts.pdf.pdf182.99 kBAdobe PDFView/Open
04_acknowledgements.pdf.pdf89.17 kBAdobe PDFView/Open
05_contents.pdf.pdf18.49 MBAdobe PDFView/Open
06_list_of_tables.pdf.pdf18.49 MBAdobe PDFView/Open
07_list_of_abbreviations.pdf.pdf182.53 kBAdobe PDFView/Open
08_chapter1.pdf.pdf2.19 MBAdobe PDFView/Open
09_chapter2.pdf.pdf3.37 MBAdobe PDFView/Open
10_chapter3.pdf.pdf2.45 MBAdobe PDFView/Open
11_chapter4.pdf.pdf2.24 MBAdobe PDFView/Open
12_chapter5.pdf.pdf3.97 MBAdobe PDFView/Open
13_chapter6.pdf.pdf4.45 MBAdobe PDFView/Open
14_conclusion.pdf.pdf415.99 kBAdobe PDFView/Open
15_references.pdf.pdf891.62 kBAdobe PDFView/Open
16_list_of_publications.pdf.pdf229.68 kBAdobe PDFView/Open
80_recommendation.pdf245.79 kBAdobe PDFView/Open
Show full item record


Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).

Altmetric Badge: