Please use this identifier to cite or link to this item: http://hdl.handle.net/10603/268867
Title: Integrated approach to scheduling problems in job shop manufacturing
Researcher: Nair, C.K.Balan .
Guide(s): Pande, S.J.
Keywords: Engineering and Technology,Engineering,Engineering Mechanical
Integrated approach scheduling problems job shop manufacturing
University: Chhatrapati Sahuji Maharaj University
Completed Date: 1994
Abstract: REFERENCE P.109-122 newline
Pagination: XVII, P.108
URI: http://hdl.handle.net/10603/268867
Appears in Departments:Institute of Engineering & Technology

Files in This Item:
File Description SizeFormat 
01_title.pdfAttached File135.3 kBAdobe PDFView/Open
02_certificate.pdf169.6 kBAdobe PDFView/Open
03_acknowledgement.pdf358.75 kBAdobe PDFView/Open
04_contents.pdf440.54 kBAdobe PDFView/Open
05_summary.pdf777.64 kBAdobe PDFView/Open
06_list of tables.pdf156.04 kBAdobe PDFView/Open
07_list of figures.pdf296.08 kBAdobe PDFView/Open
08_nomenclature.pdf389.14 kBAdobe PDFView/Open
09_chapter1.pdf4.19 MBAdobe PDFView/Open
10_chapter2.pdf6.07 MBAdobe PDFView/Open
11_chapter3.pdf3.75 MBAdobe PDFView/Open
12_chapter4.pdf2.23 MBAdobe PDFView/Open
13_chapter5.pdf2.23 MBAdobe PDFView/Open
14_chapter6.pdf1.18 MBAdobe PDFView/Open
15_references.pdf3.29 MBAdobe PDFView/Open
16_appendix.pdf396.26 kBAdobe PDFView/Open
Show full item record


Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).

Altmetric Badge: