Please use this identifier to cite or link to this item:
http://hdl.handle.net/10603/118163
Title: | A Study of Synchronous manufacturing practices on vital resources and constraints in a typical engineering environment |
Researcher: | ASHOK MEHATHA |
Guide(s): | Dr B.Ravishankar |
Keywords: | Synchronous,Drum Buffer Rope System ,Five focusing steps of TOC , six sigma |
University: | Dr. M.G.R. Educational and Research Institute |
Completed Date: | 10/07/2009 |
Abstract: | newline |
Pagination: | |
URI: | http://hdl.handle.net/10603/118163 |
Appears in Departments: | Department of Mechanical Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
abstract (4).pdf | Attached File | 27.4 kB | Adobe PDF | View/Open |
cover pages.pdf | 227.96 kB | Adobe PDF | View/Open | |
thesis.pdf | 15.38 MB | Adobe PDF | View/Open |
Items in Shodhganga are licensed under Creative Commons Licence Attribution-NonCommercial-ShareAlike 4.0 International (CC BY-NC-SA 4.0).
Altmetric Badge: